Skip to main content
guest
Join
|
Help
|
Sign In
BiodieselSYP
Home
guest
|
Join
|
Help
|
Sign In
BiodieselSYP
Wiki Home
Recent Changes
Pages and Files
Members
Home
Abstract
April May Action Plan
Bibliography
Big Three
Field Work
Finished Appleseed Photos
Formal Presentation
Grant Application
Grant Money
Informal Presentation
Lit Review
March Plan
Original Proposal
Paper
Paper Outline
Photos
tentative parts list
Timeline
Video Tours
Works Cited
April May Action Plan
Edit
0
6
…
0
Tags
No tags
Notify
RSS
Backlinks
Source
Print
Export (PDF)
UPDATED!!!!!
Field Work
4-5 to 4-9:
Design the appleseed. Use google sketch up as well as hand drawings.
Finalize my parts list.
Study the Greengineering Appleseed
4-12 to 4-16:
Buy the parts for my design
Modify the electrical system for the water heater
Put together plumbing system
4-19 to 4-23:
Set up pump with plumbing system
Add safety features to appleseed, ex: timers to electrical system
Dry Fit the final design
4-26 to 4-30:
Review dry fitted design, looking for areas to modify
make modifications to improve efficiency
Build the final model
5-3 to 5-7:
Make fuel with my appleseed.
Try both original method and 80/20 method
Test fuel for quality
5-10 to 5-14:
Final Draft of Paper due
, Back in class working on presentation
5-17 to 5-21:
Informal Presentation
5-24 to 5-28:
Formal Presentation
Non Field Work
4-5 to 4-9:
Work on writing my paper
Spend time in library writing/editing my paper
Send my design plans to Graydon and other biodiesel experts
4-12 to 4-16:
Meet with reader to discuss my paper
Meet with reader to discuss my design and the actual building
Take photos of my field work for presentation/wiki
4-19 to 4-23:
Draft #2 Due
Take more photos photos of appleseed and biodiesel.
Start working on presentation, make an action plan for my presentation
4-26 to 4-30:
Make paper modifications based on corrections received from Draft 2
Continue to photograph my field work
Continue planning my presentation
Make a powerpoint/google presentation if action plan calls for it
5-3 to 5-7:
Finish draft of presentation
Work on logistics for presentation, bringing an appleseed upstairs. Bringing finished fuel upstairs
5-10 to 5-14:
Final Draft of Paper due
,
Back in class working on presentation.
Practice presenting to whom ever will listen
5-17 to 5-21:
Informal Presentation
Will have appleseed and biodiesel made from my appleseed
5-24 to 5-28:
Formal Presentation.
Wear a nice suit and have the appleseed and biodiesel as visuals plus a kick ass powerpoint or google slide show.
Other notes
I am going to be auditing my A and C block classes until the AP exams
Links
Lit Review
Annotated Bibliography
Paper Outline
Tentative Parts List
Field Work Planning/Updates
Paper
Javascript Required
You need to enable Javascript in your browser to edit pages.
help on how to format text
Turn off "Getting Started"
Home
...
Loading...
Field Work
4-5 to 4-9:
- Design the appleseed. Use google sketch up as well as hand drawings.
- Finalize my parts list.
- Study the Greengineering Appleseed
4-12 to 4-16:- Buy the parts for my design
- Modify the electrical system for the water heater
- Put together plumbing system
4-19 to 4-23:- Set up pump with plumbing system
- Add safety features to appleseed, ex: timers to electrical system
- Dry Fit the final design
4-26 to 4-30:- Review dry fitted design, looking for areas to modify
- make modifications to improve efficiency
- Build the final model
5-3 to 5-7:- Make fuel with my appleseed.
- Try both original method and 80/20 method
- Test fuel for quality
5-10 to 5-14:- Final Draft of Paper due, Back in class working on presentation
5-17 to 5-21:- Informal Presentation
5-24 to 5-28:Non Field Work
4-5 to 4-9:
- Work on writing my paper
- Spend time in library writing/editing my paper
- Send my design plans to Graydon and other biodiesel experts
4-12 to 4-16:- Meet with reader to discuss my paper
- Meet with reader to discuss my design and the actual building
- Take photos of my field work for presentation/wiki
4-19 to 4-23:- Draft #2 Due
- Take more photos photos of appleseed and biodiesel.
- Start working on presentation, make an action plan for my presentation
4-26 to 4-30:- Make paper modifications based on corrections received from Draft 2
- Continue to photograph my field work
- Continue planning my presentation
- Make a powerpoint/google presentation if action plan calls for it
5-3 to 5-7:- Finish draft of presentation
- Work on logistics for presentation, bringing an appleseed upstairs. Bringing finished fuel upstairs
5-10 to 5-14:- Final Draft of Paper due,
- Back in class working on presentation.
- Practice presenting to whom ever will listen
5-17 to 5-21:- Informal Presentation
- Will have appleseed and biodiesel made from my appleseed
5-24 to 5-28:Other notes
I am going to be auditing my A and C block classes until the AP exams
Links
Lit Review
Annotated Bibliography
Paper Outline
Tentative Parts List
Field Work Planning/Updates
Paper